Know your stock and where every lot went.
PureField ERP is the module for orders, shipments, warehouses and stock cards. For companies that manufacture, it also tracks recipes, batches, lots, quality control and certificates of analysis (CoA). A quote accepted in CRM becomes an order. MRP works out material requirements from recipes and stock and shows the weekly load on production equipment. It doesn't replace your accounting software.
From order to shipment, recipe to lot
- 1An order opensOrders are entered by hand or created automatically from a quote accepted in CRM, based on the quote type.
ERP · Sales order SO-1192 · Surface cleaner 5 L
Akdeniz Otel Tedarik · Antalya
ConfirmedQuantity
120 cans
- Item
- Surface cleaner 5 L
- Delivery
- 6 November 2026
- Finished stock
- Not enough
QT-2236 · QuoteSource · accepted in CRMAccepted - 2Material needs are calculatedMRP checks the recipe against warehouse stock and shows how much of each raw material is short.
ERP · MRP CompletedSurface cleaner 5 L · 1,200 litres
Recipe R-12
- Raw materials
- 6 items
- In stock
- 5 items
- Short
- Surfactant · 40 kg
- Based on
- Recipe and warehouse stock
Purchase suggestion ready
Raised for the missing surfactant.
- 3The batch is producedThe batch opens from the recipe. The tank, equipment and raw material lots used are written to the batch.
ERP · Batch BT-0391 · Surface cleaner 5 L
Recipe R-12 · Tank T-2
Awaiting QCPlanned
1,200 L
- Lot no
- L-261021-03
- Raw materials
- 6 items · reserved from stock
- Quality control
- pH and viscosity pending
- CoA
- After quality approval
2 orders are ready to ship once the lot is released.
- 4Quality signs offQuality results are entered, the lot is released and the certificate of analysis (CoA) is attached to it.
ERP · Lot ReleasedL-261021-03 · Surface cleaner 5 L
Batch BT-0391 · Tank T-2
- Awaiting QC
- Results entered
- Released
- pH
- Within spec
- Viscosity
- Within spec
- CoA
- Attached to the lot
- 5It shipsThe released lot is linked to the order, the shipment is planned and warehouse stock is updated.
ERP · Shipment PlannedSH-0478 · SO-1192
Akdeniz Otel Tedarik · Antalya
- Lot
- L-261021-03 · released
- Quantity
- 120 cans · 5 L
- Ship date
- 4 November 2026
- Warehouse stock
- Updated
Product passportRecipe, raw material lots, QC results
SO-1192 · Surface cleaner 5 L
Akdeniz Otel Tedarik · Antalya
Quantity
120 cans
- Item
- Surface cleaner 5 L
- Delivery
- 6 November 2026
- Finished stock
- Not enough
What's in ERP
Stock cards and warehouses
Every product and consumable has a stock card. You can set up several warehouses and stock locations.
Orders and shipments
Customer orders and shipments are planned and tracked. An accepted quote opens an order automatically, based on its type.
Recipes and recipe rules
Product recipes, raw materials and recipe rules are defined before production.
Batches and lots
Every production batch gets a lot number. Tanks, equipment and raw material lots are linked to the batch, so you can trace back.
Quality control and CoA
A lot is released after quality control. The certificate of analysis and product documents stay attached to the lot.
MRP
Calculates material requirements from recipes and stock and suggests production and purchase orders. It compares each week's load on production equipment with its capacity and flags overloads.
Product passport
A lot's recipe, raw material lots, quality results and shipment appear together in its product passport.
Frequently asked questions
Is there MRP?
What does PureField ERP cover?
We don't manufacture, we only hold stock. Is it still useful?
What kind of production is it built for?

Trace one of your batches through your own records.
No credit card needed during the trial.
